ATTENTION! Planned operation of the VL1000 lift on 14.9.2024 is moving to 28.9.2024.
ATTENTION! The originally planned operation of the VL1000 lift on 14.9.2024 is moved another week to 28.9.2024. The reason is too wet terrain in the lower....
Read more












